Skip to main content
  • Home
    • About MPLX
      • Logistics and Storage
      • Gathering and Processing
      • Board of Directors
        • Gary R. Heminger
        • Pamela K.M. Beall
        • Michael L. Beatty
        • Christopher A. Helms
        • Michael J. Hennigan
        • Garry L. Peiffer
        • Dan D. Sandman
        • Frank M. Semple
        • J. Michael Stice
        • John P. Surma
        • Donald C. Templin
      • Officers
        • Michael J. Hennigan
        • Pamela K.M. Beall
        • Gregory S. Floerke
        • John S. Swearingen
        • Suzanne Gagle
        • Raymond L. Brooks
        • Rick D. Hessling
        • Brian K. Partee
        • David L. Whikehart
        • Timothy J. Aydt
        • Molly R. Benson
        • Peter Gilgen
        • C. Kristopher Hagedorn
        • Kristina A. Kazarian
        • Shawn M. Lyon
      • Fact Sheet
      • Image Gallery
      • Terms of Use
      • Privacy Policy
    • Investors
      • Stock Information
        • Stock Information
      • News Releases
      • SEC Filings
      • Events and Presentations
        • Presentations
      • Investor Data
        • Qualified Notices
      • Corporate Governance
        • Governance Principles
        • Board of Directors
        • Board Committees and Charters
        • Communications from Interested Parties
        • Officers
        • Code of Ethics for Senior Financial Officers
        • Code of Business Conduct
        • Policies and Guidelines
        • Certificate of Limited Partnership
        • CEO/CFO Certifications
      • Annual Report & 10-K
      • Unitholder Services and FAQs
    • Marathon Pipeline
    • Markwest
      • Visit the MarkWest site
      • Launcher Receiver Emission Reduction Systems
    • Tarriffs
    • Contact Us
      • Investor Relations
      • Unitholder Services
      • Corporate Public Affairs
      • MPC Supply Chain
Skip to main content

News Release

Contact
  • Home
  • Operations
    • Crude Oil and Products Logistics
    • Natural Gas and NGL Services
    • Tariffs
  • Investors
  • Sustainability
    • Reducing Our Carbon Footprint
    • Conserving Natural Resources
    • Safety
    • Operating With Integrity
    • Stakeholder Engagement
  • About
    • Board of Directors
    • Leadership
    • Careers
    • Contact
View all news

Crimson Midstream and MPLX Announce Extension of Binding Open Season for Swordfish Pipeline to Align with Capline Reversal Open Season

01/31/2019
Download the PDF version PDF Format (opens in new window)

FINDLAY, Ohio, Jan. 31, 2019 /PRNewswire/ -- Crimson Midstream, LLC and MPLX LP (NYSE: MPLX) today announced an extension to the binding open season on the Swordfish Pipeline to align with the recently announced binding open season by Capline Pipeline Company LLC. Additionally, the Louisiana Offshore Oil Port (LOOP) recently confirmed the loading of three VLCCs in seven days from the deepwater port and stated the number of vessels loaded can be scaled to meet increasing market demand.

To allow prospective shippers sufficient time to evaluate this new information and to solicit additional commitments for transportation service on the Swordfish Pipeline, the binding open season will now conclude at 12 p.m. EDT on April 30, 2019.

The Swordfish Pipeline is being jointly developed by Crimson and MPLX to provide connectivity from existing terminal facilities in St. James, Louisiana, and Raceland, Louisiana, to the Louisiana Offshore Oil Port (LOOP). The proposed pipeline would be a multi-diameter batched system with the ability to transport up to 600,000 barrels of crude oil per day and provide shippers with access to storage services, vessel loading, as well as connectivity to other carriers at the Clovelly Hub. The in-service date for the Swordfish Pipeline is anticipated to be in the first half of 2020. 

About Swordfish Pipeline  
The proposed Swordfish Pipeline would originate from terminal facilities in St. James, Louisiana, and Raceland, Louisiana, and provide service to the Clovelly Hub. Storage and further transportation services to end markets would be facilitated through the Clovelly Hub and connecting carriers. Pending shipper interest and final construction of the project, the Swordfish Pipeline is expected to be a multi-diameter (16", 20" and 30") batched system with the ability to transport various levels of capacity, from approximately 170,000 to 600,000 barrels of crude oil per day based on market demands. The completion of the Swordfish Pipeline will have minimal impact on current shippers on the Crimson system, as their ability to access the St. James and local refining markets will be maintained. 

Open Season Process 
Documents and further details related to the binding open season will be made available upon completion of a confidentiality agreement, available at:

http://www.crimsonmidstream.com/shipper-information
http://www.mplx.com/St_James_to_Clovelly_Binding_Open_Season/

All interested shippers should submit an executed confidentiality agreement to:

Will Airhart
Attorney
539 S. Main St., Rm. 887-M
Findlay, OH 45840
Direct: 419-421-4561 
Email: waairhart@mplx.com

This press release contains forward-looking statements within the meaning of the federal securities laws. These forward-looking statements relate to, among other things, timing for the anticipated operations discussed above. You can identify forward-looking statements by words such as "anticipate," "believe," "design," "estimate," "expect," "forecast," "goal," "guidance," "imply," "intend," "objective," "opportunity," "outlook," "plan," "position," "pursue," "prospective," "predict," "project," "potential," "seek," "strategy," "target," "could," "may," "should," "would," "will" or other similar expressions that convey the uncertainty of future events or outcomes. Such forward-looking statements are not guarantees of future performance and are subject to risks, uncertainties and other factors, some of which are beyond the control of the companies and are difficult to predict. Factors that could impact the opportunities described above are: the timing and extent of changes in commodity prices and demand for crude oil, refined products, feedstocks or other hydrocarbon-based products; continued/further volatility in and/or degradation of market and industry conditions; changes to the expected construction costs and timing of projects; completion of pipeline capacity by competitors; the ability to obtain required regulatory approvals on a timely basis; or the occurrence of an operational hazard or unforeseen interruption. In addition, the forward-looking statements included herein could be affected by general domestic and international economic and political conditions.

Cision View original content to download multimedia:http://www.prnewswire.com/news-releases/crimson-midstream-and-mplx-announce-extension-of-binding-open-season-for-swordfish-pipeline-to-align-with-capline-reversal-open-season-300787697.html

SOURCE MPLX LP

View all news
Brand Logo
Other Sites
  • Marathon Petroleum Corporation
  • Marathon Pipe Line LLC
  • Rendezvous Pipeline
  • Arkoma Pipeline
  • Customer Portal (MPLX/Markwest)
Short Cuts
  • About
  • Careers
  • Contact
  • Investors
  • Operations
  • Pipeline Safety
  • Sustainability
  • Tariffs
  • Pipeline Launcher/Receiver Emissions Reduction System

200 East Hardin Street

Findlay, Ohio 45840

Tel: (419) 421-2414

  • © 2012-2022 MPLX LP
  • Terms of Use
  • Privacy Policy
© Powered By Q4 Inc.